







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
See the difference
Before
After
Before
After
Before
AfterQuartz & Granite Countertops in Orange, CA
Quartz and granite countertop installation in Orange, CA typically runs from $55 to $95 per square foot for quartz and $60 to $110 per square foot for granite, including templating, fabrication, and installation on a standard 30-square-foot kitchen. Quartz is an engineered stone (ground quartz mixed with resin, non-porous, no sealing needed), while granite is a natural slab cut from quarries and sealed on install. Both hold up to daily cooking and both will outlast the cabinets underneath them. The difference is in how they age, how they’re priced, and who installs them.
We install quartz and granite as part of full Kitchen Remodeling work and as a stand-alone countertop swap. Every job starts with a written price and a written scope, delivered before templating, before demolition, before anyone touches the old laminate. That’s Clause 1 of The Haven Standard, and it’s why Rowan Construction Group Orange quotes countertops the same way we quote roofs and additions. If you want a number you can read tonight, call (844) 320-7508 and we’ll put a written estimate together.
We work with Cambria and Caesarstone quartz, plus granite slabs sourced through the fabricator we’re pairing with. Our technicians have up to 19 years of experience in surface work, kitchen construction, and substrate prep. What that experience buys you on a countertop job: knowing that a dishwasher bracket hidden under the old counter will shift the new slab’s overhang, and catching it during templating instead of after the stone is cut.
Key Takeaways
- Quartz runs $55 – $95/sq ft installed in Orange; granite runs $60 – $110/sq ft. A typical 30 sq ft kitchen lands between $1,800 and $3,200.
- Quartz never needs sealing. Granite needs re-sealing every 1 – 2 years in Orange’s hard-water climate.
- Written flat price before templating, signed change order before any scope change.
- Documented photo record of old counter removal, substrate condition, and new install, included on every job.

When You Need Quartz & Granite Countertops
- The laminate is delaminating near the sink. This is the most common call we get in the older single-story homes around the Plaza Historic District and Old Towne Orange. Twenty-plus years of water sitting on a particleboard substrate behind the sink turns the edge soft, and once the substrate is soft, no countertop lamina will sit flat on it. We replace the substrate before we template.
- You’re remodeling the kitchen and the counter is the last “cheap” item. If the cabinets are KraftMaid or Wellborn and everything else has been updated, an original 1998 laminate counter betrays the whole room. We see this often in the 2015 – 2022 purchase wave homes off Chapman Avenue, where the prior owner updated cabinets but stopped at the countertop.
- The granite slab from the previous owner is chipped at the edge. Granite chips at the edge profile rather than across the surface, and a chip at the dishwasher corner is common in homes that were remodeled in the mid-2000s. Repair is possible for small chips; full removal and replacement is often what homeowners end up wanting once they price the repair against a replacement, and we’ll quote both.
- The water in Orange is hard enough that a natural stone counter is staining. Orange draws from the Orange County groundwater basin, and the calcium load puts a haze on unsealed granite near the sink within a couple of years. If you’re resealing annually and it’s still hazing, the sealer has given up and the slab needs a proper clean and re-seal, or the counter needs replacing.
- You’re adding an island and want the surface to match. Kitchen islands added during a Kitchen Remodeling in Orange project almost always need a slab from the same quarry run as the existing perimeter counter, and matching granite three years post-install is not always possible. Quartz with a stable pattern is the safer match.
- You’re selling and the buyer’s inspector flagged the counter. Old counters around sink cut-outs with visible substrate rot come up in pre-sale reports. A fresh quartz or granite install is one of the highest-certainty returns in a kitchen, and it’s a fast job – typically two days from templating to install.
Our Quartz & Granite Countertops Process
- Written estimate and scope before we visit. We quote the slab material, the square footage, the edge profile, the sink cut-out, and the removal and disposal of the existing counter on one page. The price is flat. You sign it, or you don’t. No countertop project starts without a signed written price.
- In-home measure and substrate inspection. We measure every wall run, check for square (very few kitchens in the 1950s ranch homes near Hart Park are), and inspect the substrate under the existing counter. Soft substrate is replaced before templating; this prevents the slab from cracking later and it’s the item most countertop quotes leave off.
- Slab selection with the fabricator. You see the actual slab, not a sample card. Quartz from Cambria and Caesarstone has a stable pattern, so what you see is what you get. Granite is one slab of one quarry run, so we bring you to see the slab. If you bring us a competitor’s written estimate, we’ll review it line by line at no charge as a second opinion.
- Templating. A physical template is made at the site and transported to the fabricator. For undermount sinks, the sink is on site for templating and stays on site through install. If you’re changing the sink at the same time, this is the visit where the new sink gets test-fit.
- Removal and install day. Old counter removed, substrate cleaned and checked, new slab set, seams epoxied and color-matched, edge profile finished, sink sealed. We photograph every stage: old counter removal, substrate condition, seam placement, sealant cure. That photo record is a deliverable you keep, not an upsell.
- Sealing (granite only) and 365-Day walk-through. Granite gets sealed on install and re-sealed on a 1 – 2 year schedule, which we’ll put in writing with your warranty. Quartz doesn’t need sealing. Every install is backed by our 365-Day Done Right Promise: if the seam fails, the edge chips, or the seal lifts within a year, we come back and make it right.
We also install countertops during full kitchen work, which means the slab install lands in the right sequence relative to the cabinets, the backsplash, and the plumbing. For a kitchen where the counter is one item in a larger job, that sequencing matters and is handled under the same written scope as the cabinets and fixtures.

Quartz & Granite Countertops Pricing in Orange
Here are the ranges we quote in Orange. These are installed prices, including templating, fabrication, standard edge profile, and removal and disposal of the old counter. They are not per-square-foot countertop material prices from a big-box store – those exclude fabrication and install, which is where the real cost lives.
| Item | Price Range in Orange |
|---|---|
| Quartz, standard (Cambria, Caesarstone entry lines) | $55 – $75 / sq ft installed |
| Quartz, premium pattern or slab | $75 – $95 / sq ft installed |
| Granite, standard | $60 – $85 / sq ft installed |
| Granite, premium or exotic | $85 – $110+ / sq ft installed |
| Typical 30 sq ft kitchen, quartz | $1,800 – $2,600 |
| Typical 30 sq ft kitchen, granite | $1,900 – $3,200 |
| Removal and disposal of old counter | $150 – $350 |
| Undermount sink cut-out | $150 – $350 |
| Substrate repair (if old counter has water damage) | $200 – $800 |
| Edge upgrade (bullnose, ogee, waterfall island) | $15 – $45 / linear ft |
| Granite re-seal (ongoing, every 1 – 2 years) | $150 – $300 |
What drives the price: slab cost (exotic granite is priced by the slab, not the square foot, and has a different quote for every run); square footage (obvious, but the second slab run for an L-shaped counter pushes you into a second slab); edge profile (a bullnose edge costs more than a straight edge; a waterfall island edge is its own piece of fabrication); cut-outs (an undermount sink adds a cut-out and edge polish; a drop-in sink is less); and substrate condition. The counter we quote is the counter we deliver, in writing, before a single slab is cut.
On a kitchen where you’re doing the counter as part of a bathroom remodel or home addition at the same time, we quote the counter separately, so you can see exactly what the stone costs and what the rest of the job costs. And if a competitor’s quote has a per-square-foot line you can’t decode, our free second-opinion review will lay it out for you – line by line, no charge.
Every install comes with a documented photo record, a written warranty, and the 365-Day Done Right Promise. If we miss, we make it right. That’s The Haven Standard, not a slogan.
FAQs – Quartz & Granite Countertops
How much does quartz countertop installation cost in Orange, CA?
Quartz countertop installation in Orange runs $55 – $95 per square foot installed, which puts a typical 30 sq ft kitchen at $1,800 – $2,600 including removal of the old counter. The exact number depends on the slab line, the edge profile, and whether the sink is undermount or drop-in. Call (844) 320-7508 for an exact written quote – estimates are free and the price is flat before templating.
Is quartz or granite cheaper in Orange?
Granite is often the same or slightly cheaper installed in Orange, with entry-level granite at $60 – $85 per square foot and entry quartz at $55 – $75. But quartz stays cheaper over time because it never needs re-sealing, while granite needs re-sealing every 1 – 2 years at $150 – $300 per visit. Over a decade, quartz usually wins on total cost. Call us for a side-by-side written quote on your specific square footage.
Can you install a quartz or granite countertop in Orange the same week?
Yes, when the slab is in stock at the fabricator. Templating typically happens two to three days after the written price is signed, and install happens two to five days after templating – so a full replacement is realistic within a week or slightly more. Custom-pattern quartz or an exotic granite slab adds lead time. Call (844) 320-7508 and we’ll tell you the actual timeline for the slab you want.
What does the substrate look like under an old counter, and why does it matter?
The substrate is the layer between the cabinets and the stone – typically plywood or particleboard on top of the cabinet boxes. In Orange’s older homes, water from the sink area often softens particleboard over 20+ years, and a new stone slab installed over soft substrate will crack or rock. We inspect and photograph the substrate during the measure visit and quote the repair before we cut stone. That’s why our written scope includes the substrate check – it’s the step most countertop quotes skip and it’s the one that decides whether the job is done right.
If your counter is due for replacement, or you’re remapping a kitchen and the counter is one line item in a bigger scope, call our team at (844) 320-7508. We’ll write the price down first, hand you a free written estimate, and answer the phone with a live person, 24 hours a day. Background-checked, uniformed technicians every visit. Free second opinion on any written estimate you already have. And if we don’t get it right, the 365-Day Done Right Promise covers it – that’s the whole point of the Haven Standard, and it’s how we’ve kept projects within a few percent of the agreed cost across thousands of jobs.
Written by the team at Rowan Construction Group Orange, serving Orange.


